Kingston and Sutton

GIS and OS Tiles

StatMap

https://intranet.kingston.gov.uk/task/map-gallery/#chapter_head

https://intranet.sutton.gov.uk/task/map-gallery/#chapter_head

GIS Manager for Street Gazetteer

OS Tiles

Kingston:

Kingston OS Tiles dwg files are saved as unitless

X:\Autocad_library\RBK CAD Library\CAD Library\RBK OS Maps 2022

TQ1558, TQ1559, TQ1560, TQ1561, TQ1562, TQ1563, TQ1564, TQ1565, TQ1566, TQ1567, TQ1658, TQ1659, TQ1660, TQ1661, TQ1662, TQ1663, TQ1664, TQ1665, TQ1666, TQ1667, TQ1668, TQ1669, TQ1670, TQ1671, TQ1672, TQ1758, TQ1759, TQ1760, TQ1761, TQ1762, TQ1763, TQ1764, TQ1765, TQ1766, TQ1767, TQ1768, TQ1769, TQ1770, TQ1771, TQ1772, TQ1858, TQ1859, TQ1860, TQ1861, TQ1862, TQ1863, TQ1864, TQ1865, TQ1866, TQ1867, TQ1868, TQ1869, TQ1870, TQ1871, TQ1872, TQ1958, TQ1959, TQ1960, TQ1961, TQ1962, TQ1963, TQ1964.1, TQ1964, TQ1965, TQ1966, TQ1967, TQ1968, TQ1969, TQ1970, TQ1971, TQ1972, TQ2062, TQ2063, TQ2064, TQ2065, TQ2066, TQ2067, TQ2068, TQ2069, TQ2070, TQ2071, TQ2072, TQ2073, TQ2163, TQ2164, TQ2165, TQ2166, TQ2167, TQ2168, TQ2169, TQ2170, TQ2171, TQ2172, TQ2173, TQ2263, TQ2264, TQ2265, TQ2267, TQ2268, TQ2269, TQ2270, TQ2271, TQ2272, TQ2273, TQ2363, TQ2364, TQ2365, TQ2366, TQ2367, TQ2368, TQ2369, TQ2370, TQ2371, TQ2372, TQ2266

Sutton:

X:\Autocad_library\RBK CAD Library\CAD Library\Sutton OS Maps 2022

TQ2161, TQ2162, TQ2163, TQ2164, TQ2165, TQ2166, TQ2167, TQ2168, TQ2260, TQ2261, TQ2262, TQ2263, TQ2264, TQ2265, TQ2266, TQ2267, TQ2268, TQ2360, TQ2361, TQ2362, TQ2363, TQ2364, TQ2365, TQ2366, TQ2367, TQ2368, TQ2460, TQ2461, TQ2462, TQ2463, TQ2464, TQ2465, TQ2466, TQ2467, TQ2468, TQ2559, TQ2561, TQ2562, TQ2563, TQ2564, TQ2565, TQ2566, TQ2567, TQ2568, TQ2659, TQ2660, TQ2661, TQ2662, TQ2663, TQ2664, TQ2665, TQ2666, TQ2667, TQ2668, TQ2758, TQ2759, TQ2760, TQ2761, TQ2762, TQ2763, TQ2764, TQ2765, TQ2766, TQ2767, TQ2768, TQ2858, TQ2859, TQ2860, TQ2861, TQ2862, TQ2863, TQ2864, TQ2865, TQ2867, TQ2868, TQ2958, TQ2959, TQ2960, TQ2961, TQ2962, TQ2963, TQ2964, TQ2965, TQ2966, TQ2967, TQ2968, TQ3060, TQ3061, TQ3062, TQ3063, TQ3064, TQ3065, TQ3066, TQ3067, TQ3068, TQ3160, TQ3161, TQ3162, TQ3163, TQ3164, TQ3165, TQ3166, TQ3167, TQ3261, TQ3262, TQ3263, TQ2560, TQ2866

Projects

Cagla

Banstead Road South Zebra

Folder:

X:\LBS Sutton schemes\D&D\Projects\LBS-30000 LIP Projects\LBS-30024 Banstead Road South Zebra Crossing

Coordinates:

51.346776573106, -0.18208884889114

Church Hill Road 7.5T

Folder:

X:\LBS Sutton schemes\D&D\Projects\T30136_Churchill Rd Area\05_Drawings\PDF drawings\3 – 7.5T HGV Lorry Ban

Coordinates:

51.3686936, -0.2198767

ACTION: There are quite a few minor mistakes still on the design/drawing. Sent Umer some markup. Drawing ref numbers etc still need to be checked as there were many mistakes.

Langley Park Road

Folder:

X:\LBS Sutton schemes\D&D\Projects\LBS-30000 LIP Projects\LBS-30023 Langley Park Road jw Cedar Road Island

Coordinates:

51.358906153705, -0.18608760451486

Ruskin Road Area

Folder:

X:\LBS Sutton schemes\D&D\Projects\LBS-30000 LIP Projects\LBS-30008 Ruskin Road area

Coordinates:

51.362761885406, -0.16432483388479

ACTION: In meeting with Lynn, presented options for the two zebra crossings that Cagla is now working on. For priority change on one of the junctions, explained to her that it won’t be feasible due to width constraints of the carriageway, the vehicle tracking didn’t work because of the slalom effect in the proposed layout at the junction, and other movements got restricted too. I showed her some other options and she agreed for us to do a revised design. She expects the drawings now by end of September.

Sheffield Stands Sutton Parks

Folder:

X:\LBS Sutton schemes\D&D\Projects\LBS-30000 LIP Projects\LBS-30020 Sheffield Stands Sutton Parks

Coordinates:

51.371254807507, -0.18718756551023

South Lane Zebra

Folder:

X:\RBK Kingston schemes\Design Services\01 Project documents\RBK-30000 LIP Projects\RBK-30017 South Lane Zebra Crossing

Coordinates:

51.3889405, -0.2605332

ACTION: Sent alternative location design to Younes, with reasoning why it works better.

Surbiton Hill Road

Folder:

X:\RBK Kingston schemes\Design Services\01 Project documents\RBK-40000 Non LIP Projects\RBK-40018 Surbiton Hill Road Speed Cushions and Island

Coordinates:

51.397840550963, -0.30000125872265

Haibat

20mph Review

ACTION: Produced a skeletal borough map with local and national grid reference, which is useful for large scale projects and site location plans:

Produced a drawing highlight some roads as requested by the client:

Client to provide a list of additional roads to be added in a different colour

King Charles Road

Folder:

X:\RBK Kingston schemes\RBK Kingston schemes\Design Services\01 Project documents\RBK-30000 LIP Projects\RBK-30030 King Charles Road – Public Realm Improvement

X:\RBK Kingston schemes\RBK Kingston schemes\Design Services\01 Project documents\RBK-30000 LIP Projects\RBK-30030 King Charles Road – Public Realm Improvement\08_CAD\DWG Files\Feasibility Design

Coordinates:

51.387420097395, -0.29169474664668

ACTION: Initially the scope, scheme background, available/expected funding, client ambitions etc were not clear. Had detailed meeting with the client a week ago to understand what was required.

Advised the client of potential access requirements if the street was to be closed for a public realm project.

Did site visit and investigated further to establish the local needs. It was determined that what appeared to be a residential garage with a crossover (agreed by the client) was no longer a garage and access was not required. Had a discussion with a local business who were using some free parking spaces available in that section of the road, told them about the scheme and they expressed willingness to give up the free parking space in favour of a public realm scheme, but requested access for deliveries. It also came to light that another access over a waterway was required by the Environment Agency – they have cameras installed there and send lorries to clean up when required. Access for them can be maintained through a FS padlock as they have the same type of lock on their gate. Will need to be included in the consultation process.

Advised Cagla to produce a drawing based on the above, and she has produced a design from that:

HA also produced a more elaborate drawing (work in progress) showing different elements that are possible to be incorporated in that space and taken to consultation to narrow down the choices:

To be discussed with the client if we are going in the right direction.

Provided the above design, and cost estimate from FMC to Younes for taking to the committee and bidding.

North Kingston Healthy Streets Phase 2

Folder:

X:\RBK Kingston schemes\RBK Kingston schemes\Design Services\01 Project documents\RBK-30000 LIP Projects\RBK-30008 North Kingston Healthy Streets Phase 2\

Coordinates:

51.4194465, -0.3045362

Lower Ham Road

ACTION: Initially the scope, scheme background, available/expected funding, client ambitions etc were not clear. Had detailed meeting with the client a week ago to understand what was required. Made a site visit with Pratik to take site measurements and to see the local conditions, figured out that some build-outs shown on OS maps weren’t present on site, changing the vehicle tracking requirements.

Produced the drawing below for this location:

Asked Pratik to put key and titleblock on it:

Richmond Road

ACTION: Initially the scope, scheme background, available/expected funding, client ambitions etc were not clear. Had detailed meeting with the client a week ago to understand what was required. Made a site visit with Pratik to take site measurements and to see the local conditions, figured out what could be done to improve the current narrow footway at pedestrian crossing.

This location didn’t have a simple solution. After considering several options, it was decided that the only way to widen the footway would be remove the right filter lane from the northern arm – the western arm is a no-through road so it has low traffic and it is expected that occasional right turning vehicles won’t impede the south-bound traffic too much. Pratik has produced a drawing for this:

JC

Coombe Lane West Zebra Crossing

ACTION: Suggested initial location for the zebra crossing and JC produced a drawing:

Then advised JC to add some missing elements etc:

JC has produced a revised drawing, and also advised that the location is okay for adding build-outs if desired:

Pratik

Brighton Road Surbiton – 20mph Roundels

Folder:

X:\RBK Kingston schemes\RBK Kingston schemes\Design Services\01 Project documents\RBK-90000 Lining & Signing (Minor Scheme)\RBK-90034 20mph Roundel Brighton Road Surbiton

Coordinates:

51.390986, -0.308688

ACTION: Pratik hasn’t shared details of this scheme yet.

Green Wrythe Lane Corridor

Folder:

X:\LBS Sutton schemes\D&D\Projects\LBS-30000 LIP Projects\LBS-30004 Green Wrythe Lane Corridor

Coordinates:

51.372772, -0.168162
51.376614, -0.170093
51.377535, -0.170482
51.384628, -0.174103

ACTION: Pratik hasn’t shared details of this scheme yet.

H-Bar marking various locations

Folder:

X:\RBK Kingston schemes\RBK Kingston schemes\Design Services\01 Project documents\RBK-90000 Lining & Signing (Minor Scheme)\RBK-90033 H-Bar marking various locations

Coordinates:

Various – X:\RBK Kingston schemes\RBK Kingston schemes\Design Services\01 Project documents\RBK-90000 Lining & Signing (Minor Scheme)\RBK-90033 H-Bar marking various locations\01_Commission Brief

ACTION: Pratik hasn’t shared details of this scheme yet.

High Street, Kingston – RBK Cycle Routes

Folder:

X:\RBK Kingston schemes\RBK Kingston schemes\Design Services\01 Project documents\RBK-90000 Lining & Signing (Minor Scheme)\RBK-90027 RBK Cycle Routes – High Street, Kingston

Coordinates:

51.408947, -0.306302

ACTION: Pratik hasn’t shared details of this scheme yet.

Legible London, way finding signs

Folder:

X:\RBK Kingston schemes\RBK Kingston schemes\Design Services\01 Project documents\RBK-90000 Lining & Signing (Minor Scheme)\RBK-90043 Legible London, Way finding signs

Coordinates:

51.41262, -0.30103

ACTION: Pratik hasn’t shared details of this scheme yet.

Malden Road and Idmiston Road Parking Restrictions

Folder:

X:\RBK Kingston schemes\RBK Kingston schemes\Design Services\01 Project documents\RBK-90000 Lining & Signing (Minor Scheme)\RBK-90025 Malden Road and Idmiston Road Parking Restrictions

Coordinates:

51.384916, -0.251875

ACTION: Pratik hasn’t shared details of this scheme yet.

Manorgate Road Width Restriction

Folder:

X:\RBK Kingston schemes\RBK Kingston schemes\Design Services\01 Project documents\RBK-40000 Non LIP Projects\RBK-40028 Manorgate Road Width Restriction

Coordinates:

51.413783, -0.284904

ACTION: Checked Pratik’s drawings, and provided the client detailed feedback from personal experience of driving through this road. Based on the feedback, the client agreed to consider another design option, for which the drawing has also been produced.

Ridge Road Zebra Crossing

Folder:

X:\LBS Sutton schemes\D&D\Projects\LBS-30000 LIP Projects\LBS-30003 Ridge Road Zebra Crossing

Coordinates:

51.380465, -0.215002

ACTION: Pratik hasn’t shared details of this scheme yet.

Surbiton Road – new parking sign

Folder:

X:\RBK Kingston schemes\RBK Kingston schemes\Design Services\01 Project documents\RBK-90000 Lining & Signing (Minor Scheme)\RBK-90036 New Parking Sign on Surbiton Road

Coordinates:

51.401743, -0.304419

ACTION: Pratik hasn’t shared details of this scheme yet.

Sutton High Street and Oakhill Road Safety Scheme

Folder:

X:\LBS Sutton schemes\D&D\Projects\LBS-30000 LIP Projects\LBS-30005 Sutton High Street and Oakhill Road Safety Scheme

Coordinates:

51.371333, -0.194623

ACTION: Pratik hasn’t shared details of this scheme yet.

Thomas

Collingwood Road 7.5T

X:\LBS Sutton schemes\D&D\Projects\LBS-30000 LIP Projects\LBS-30027 Collingwood Road 7.5t HGV Ban\02_Project Management\TFL Approvals

X:\LBS Sutton schemes\D&D\Projects\LBS-30000 LIP Projects\LBS-30027 Collingwood Road 7.5t HGV Ban\08_CAD\Issued PDF Drawings\15-07-2025 TfL HAD Submission

ACTION: Had a meeting with TfL along with Thomas to address the issues raised by TfL and get it to construction stage.

Jubilee Way

Folder:

X:\RBK Kingston schemes\Design Services\01 Project documents\RBK-50000 Cycle Route Projects\RBK-50004 Jubilee Way

Coordinates:

51.371397, -0.283886

ACTION: Had several meetings with Thomas, Umer, then with the client team, with JC etc. Highlighted the issues with the original design. Client explained the reasoning behind the odd design – mainly approval from the committee, and not being allowed to remove some trees for a new cycle path. JC has now produced an option.

Viral

Clarence Avenue Zebra Crossing

Folder:

X:\RBK Kingston schemes\Design Services\01 Project documents\RBK-30000 LIP Projects\RBK-30015 Clarence Avenue Zebra Crossing

Coordinates:

51.4091477, -0.2691023

ACTION: Did site visit with Viral, assessed the options, took site measurements so that a topo survey is not required anymore that Viral wanted.

Viral drafted a revised drawing:

Then Viral has produced a drawing, to be approved by Umer:

Kingston Academy Pedcycle lane Crossover

Folder:

X:\RBK Kingston schemes\Design Services\01 Project documents\RBK-40000 Non LIP Projects\RBK-40031 Kingston Academy Pedcycle lane Crossover

Coordinates:

51.423818756532, -0.3036757845044

ACTION: Viral wanted a topo survey for this site. Advised that it is not required for this scheme. Did a site visit with Viral and FMC. Determined that it won’t be feasible to lower the utility cover because it’s a plastic box, hence it won’t be cheap to bring a cycle path straight over it due to sharp ramp required after that:

Now the options are:

  1. Spend money to get the utility cover lowered to put a cycle path as requested by the client – shown in red
  2. bifurcate the in and out lanes to avoid the utility cover – shown in green
  3. utilise the existing crossovers by creating a shared path along the footpath between the existing crossovers for the school, may need to widen the crossovers if desired – shown in orange

Langley Road zebra crossing

Folder:

X:\RBK Kingston schemes\Design Services\01 Project documents\RBK-30000 LIP Projects\RBK-30018 Langley Road – Zebra Crossing

Coordinates:

51.388168679277, -0.29930275945715

ACTION: Original option as requested by the client had an odd arrangement of the carriageway narrowing down to a single lane at the crossing while having two lanes at the approach zigzags and the crossing width was too narrow (2.1m):

Then produced another option where the build-out was removed. Even though the footway is narrow, the carriageway is also only 6m wide, that’s why didn’t add any build-outs.

Then Umer advised to have build-outs to widen the footway at the crossing, leaving about 4.6m wide carriageway:

+Add location
made with OUM